Operation CHARM: Car repair manuals for everyone.

Valve: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Resurface/Grind
All Cylinders
One Bank6.04.2AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Both Banks9.46.0AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
One Cylinder
One Bank4.63.3AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Both Banks6.64.5AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Note
With AC, Add0.40.2A
To Knurl Valve Guide, Add
One0.10.0A
To Renew Valve Guide, Add
One0.20.0A
To Ream Guide, Add0.10.0A
To Renew Rocker Arm, Add
One Bank0.30.0A
Both Banks0.60.0A
To Renew Lifters (Roller Type) Add
One1.10.0A
To Renew Timing Chain, Add1.20.0A
To Renew Camshaft, Add2.00.0A
To Perform Tune-Up, Add0.40.0A