| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| VALVE BODY & RELATED PARTS |
| 42RLE |
| Oil Leak, Diagnosis | 0.5 | 0.0 | C | Includes: Clean And Dry Outside Of Case And Operating Unit To Determine Point Of Leakage. |
| Transmission, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
| 45RFE, 545RFE |
| Oil Leak, Diagnosis | 0.5 | 0.0 | B | Includes: Clean And Dry Outside Of Case And Operating Unit To Determine Point Of Leakage. |
| Transmission, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
| Replace |
| 42RLE |
| Complete Assembly Without Transfer Of Parts | 4.6 | 3.2 | B | |
| NOTE |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To R&R Driveplate, Add | 0.2 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 5.2 | 3.3 | B | |
| NOTE |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To R&R Driveplate, Add | 0.2 | 0.0 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| 45RFE, 545RFE |
| Complete Assembly Without Transfer Of Parts | 4.4 | 3.2 | B | |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.1 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To R&R Driveplate, Add | 0.2 | 0.1 | B | |
| Complete Assembly With Transfer Of Parts | 5.0 | 0.0 | B | Includes: R&I Transmission. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.1 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To R&R Driveplate, Add | 0.2 | 0.1 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| Overhaul/Rebuild |
| 42RLE | 11.9 | 0.0 | A | Includes: R&I Transmission. |
| NOTE |
| To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |
| 45RFE, 545RFE | 13.2 | 0.0 | A | Includes: R&I Transmission. |
| NOTE |
| With Skid Plate, Add | 0.1 | 0.1 | A | |
| To R&R Driveplate, Add | 0.2 | 0.1 | A | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |
| To Overhaul Valve Body, Add | 1.0 | 0.0 | A | |