PC1
- Perform Electrical System Precheck.- Verify that all of the following connectors are connected and the terminals are secure and free of contaminants or corrosion.
- 2-pin front sensor connectors (2)
- 12-pin HCU connector
- 2-pin pump motor connector
- 16-pin ABS harness connector
- 2-pin ABS power connector
- 2-pin rear axle connector
- Open power distribution box and verify that both the system relay and 60A fuse are fully seated and intact.
- Verify that the system ground eyelet on the driver's side radiator support is firmly attached to the ground stud and is free of corrosion and excessive dirt.
- Are all connections secure and electrical components fully seated and intact?
YES -- Go to PC2. PC2
NO -- Correct condition. Go to PC2. PC2