FUEL METERING VALVE INSPECTION [WL-C, WE-C]
id0114b6804200
-
Caution
-
• The supply pump is sealed to maintain proper function. Special tools and testers are required when disassembling the supply pump. Disassembling the supply pump without special tools and testers will cause a malfunction.
Resistance Inspection
1. Disconnect the negative battery cable.
2. Disconnect the fuel metering valve connector.
3. Measure the resistance between the fuel metering valve terminals using an ohmmeter.
-
• If as specified, carry out the “Circuit Open/Short Inspection”.
Specification
Ambient temperature (°C {°F})
|
Resistance (ohm)
|
20 {68}
|
2.6—3.15
|
Circuit Open/Short Inspection
1. Inspect for an open or short circuit in the following wiring harnesses.
-
• If there is an open or short circuit, repair or replace wiring harnesses.
Open circuit
• Power circuit (fuel metering valve terminal A and main relay terminal D)
• Ground circuit (fuel metering valve terminal B and PCM terminal 179)
Short circuit
• Fuel metering valve terminal A and main relay terminal D to ground