INTAKE SHUTTER SOLENOID VALVE (HALF OPEN) INSPECTION [WL-C, WE-C]
id0116b6811100
1. Inspect airflow between the ports under the following conditions.
-
• If not as specified, replace the intake shutter valve (half open).
• If as specified, carry out the “Circuit Open/Short Inspection.”
Circuit Open/Short Inspection
1. Inspect for an open or short circuit in the following wiring harnesses.
-
• If there is an open or short circuit, repair or replace wiring harnesses.
Open circuit
• Power circuit (intake shutter solenoid valve (half open) terminal A and main relay terminal D)
• Ground circuit (intake shutter solenoid valve (half open) terminal B and PCM terminal 155)
Short circuit
• Intake shutter solenoid valve (half open) terminal A and main relay terminal D to ground