HIGH-TENSION LEAD INSPECTION [G6]


id011895800700

1.  Remove the high-tension lead. (See HIGH-TENSION LEAD REMOVAL/INSTALLATION [G6].)

2.  Measure the resistance using a tester.

•  If not within the specification, replace the high-tension lead.
High-tension lead resistance [20°C {68 °F}]
No.1 lead: 2.9—7.7 kilohms
No.2 lead: 4.3—10.8 kilohms
No.3 lead: 5.4—13.5 kilohms
No.4 lead: 6.6—16.2 kilohms
Center lead: 4.5—11.2 kilohms