MAIN RELAY REMOVAL/INSTALLATION [F2]


id014094811200

1.  Disconnect the negative battery cable.

2.  Disconnect the main relay connector.

3.  Remove the main relay.

4.  Install the reverse order of removal.

Tightening torque
7.9—10.7 N·m {80—110 kgf·m, 69.5—95.4 ft·lbf}