POWER STEERING PRESSURE (PSP) SWITCH INSPECTION [G6]


id014095803100


Continuity inspection

Note
•  Perform the following test only when directed.

1.  Disconnect the PSP switch connector.

2.  Start the engine.

3.  Verify that the continuity between PSP switch terminal A and body ground is as indicated in the table.

•  If not as specified, replace the PSP switch.
•  If there is no malfunction, but PID value is out of specification, inspect for the following:

4.  Repair or replace faulty areas.

5.  Reconnect the PSP switch connector.


Specification

Condition

Continuity

Steering wheel in straight ahead position
No
Steering wheel fully turned
Yes

arnffw00000859
Open Circuit
―  PSP signal circuit (PSP switch connector terminal and PCM connector terminal 1P through common connector)
―  GND circuit (PSP switch body and GND)
Short Circuit
―  PSP signal circuit (PSP switch connector terminal and PCM connector terminal 1P through common connector to GND)
Power steering fluid
•  Fluid level
•  Fluid leakage
•  Fluid pressure