PROPELLER SHAFT INSPECTION


id031500800500

1.  Use a dial gauge to measure the runout of the propeller shaft at each position.

dbg315zwb005

•  If it exceeds the maximum specification, replace the propeller shaft.
Propeller shaft maximum runout
0.4 mm {0.016 in}

2.  Inspect the play and rotation of the joint by turning the universal joint in the direction shown by the arrow.

dbg315zwb006

Propeller shaft initial torque (Reference value)
0.29—1.76 N·m {3.0—17.9 kgf·cm, 2.6—15.5 in·lbf}
•  If there is excessive play or initial torque, replace the propeller shaft.