id011000506100
Coil Resistance Inspection
1.Measure the coil resistance between terminals A and B using a tester.
beltze00000084
|
Spool Valve Operation Inspection
1.Verify that the spool valve inside the oil control valve is at the maximum valve timing retard position as shown in the figure.
b3e0110e090
|
2.Apply battery positive voltage between the oil control valve terminals A and B and verify that the spool valve operates and move to the maximum valve timing advance position.
b3e0110e091
|
3.Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.