E6U011012420E02
Coil Resistance Inspection
1.Measure the coil resistance between terminals A and B using a tester.
AME2226W002
|
Spool Valve Operation Inspection
1.Verify that the spool valve inside the oil control valve is at the maximum valve timing retard position as shown in the figure.
B3E0110E0902
|
2.Apply battery positive voltage between the oil control valve terminals A and B and verify that the spool valve operates and move to the maximum valve timing retard position.
B3E0110E0913
|
3.Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.