FUEL TANK CONSTRUCTION [MZR-CD 2.2]SM1934483
FUEL TANK CONSTRUCTION [MZR-CD 2.2]

id0114f2101900

• Two rollover valves are built-in. For the rollover valve, refer to the emission system.