BRAKE SIGNAL CONSTRUCTION/OPERATION [MZR-CD 2.2]SM1934910
BRAKE SIGNAL CONSTRUCTION/OPERATION [MZR-CD 2.2]
id0140f2224400
• While the brake pedal is depressed, the brake switch contact point closes (ON) and the PCM detects
B+. While the brake pedal is released, the brake switch contact point opens (OFF) and the PCM detects
below 1.0 V.