id0110f2800300
1.Verify that the battery is fully charged. (See BATTERY INSPECTION [MZR-CD 2.2].)
2.Warm up the engine to the normal operating temperature.
3.Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR-CD 2.2].)
4.Remove the engine cover. (See ENGINE COVER REMOVAL/INSTALLATION [MZR-CD 2.2].)
5.Disconnect the following parts.
am6zzw00004444
|
6.Remove the boost sensor. (See COMMON RAIL REMOVAL/INSTALLATION [MZR-CD 2.2].)
7.Remove the EGR cooler bypass valve control solenoid valve bracket No.1. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD 2.2].)
8.Remove the coolant reserve tank. (See COOLANT RESERVE TANK REMOVAL/INSTALLATION [MZR-CD 2.2].)
9.Remove all the glow plugs. (See GLOW PLUG REMOVAL/INSTALLATION [MZR-CD 2.2].)
10.Install the SST (49 S013 102A) to the glow plug hole securely.
11.Connect the SST (49 S010 1A0A) to SST (49 S013 102A).
am6zzw00004180
|
12.Connect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR-CD 2.2].)
13.Fully depress the accelerator pedal and crank the engine.
14.Inspect each cylinder as above.
15.Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR-CD 2.2].)
16.Remove the SSTs.
17.Install in the reverse order of removal.
18.Clear the DTC from PCM memory using the M-MDS. (See AFTER REPAIR PROCEDURE [MZR-CD 2.2].)