id0113f3777700
1.Remove the VBC check valve. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR-CD 2.2].)
2.Blow through port A and verify that the airflows from port B.
am6zzw00003174
|
3.Blow through port B and verify that the air does not flow from port A.