id0140f2445800
Sensor Output Value Inspection
1.Switch the ignition to ON.
2.Monitor the ISV_POS PID using the M-MDS. (See PCM INSPECTION [MZR-CD 2.2].)
3.Start the engine and warm up the engine completely.
4.Monitor the ISV_POS PID using the M-MDS at idle. (See PCM INSPECTION [MZR-CD 2.2].)