STEERING GEAR AND LINKAGE REMOVAL/INSTALLATION [MZR-CD 2.2]SM2445564
STEERING GEAR AND LINKAGE REMOVAL/INSTALLATION [MZR-CD 2.2]

id0614008009c7

Caution
• Performing the following procedures without first removing the ABS wheel-speed sensor may possibly cause an open circuit in the wiring harness if it is pulled by mistake. Before performing the following procedures, disconnect the ABS wheel-speed sensor connector (axle side) and fix the wiring harness to an appropriate place where it will not be pulled by mistake while servicing the vehicle.
• Secure the steering wheel using tape or a cable to prevent the steering shaft from rotating after disconnecting the steering shaft. If the steering wheel rotates after the steering shaft and the steering gear and linkage are disconnected, the internal parts of the clock spring could be damaged.

1.Remove the side cover and under cover.

2.Drain the power steering fluid.

3.Remove the front auto leveling sensor. (Vehicle with front auto leveling sensor) (See FRONT AUTO LEVELING SENSOR REMOVAL/INSTALLATION.)

4.Remove the transverse member. (See TRANSVERSE MEMBER REMOVAL/INSTALLATION.)

5.Remove the intermediate shaft installation bolt, and disconnect the steering shaft. (See STEERING WHEEL AND COLUMN REMOVAL/INSTALLATION.)

6.Remove the front crossmember, lower arm, front stabilizer, and steering gear and linkage as a single unit. (See FRONT CROSSMEMBER REMOVAL/INSTALLATION [MZR-CD 2.2].)

7.Remove the front stabilizer from the crossmember component. (See FRONT STABILIZER REMOVAL/INSTALLATION.)

8.Remove in the order indicated in the table.

9.Install in the reverse order of removal.

10.After installation, inspect the front wheel alignment and adjust it if necessary. (See FRONT WHEEL ALIGNMENT.)

L.H.D.

acxwzw00000456

1
Pressure pipe
2
Return hose
3
Insulator
4
Steering gear and linkage
5
Cooling pipe

R.H.D.

acxwzw00001685

1
Pressure pipe
2
Return pipe
3
Steering gear and linkage
4
Return hose
5
Cooling pipe