WASTEGATE CONTROL SOLENOID VALVE INSPECTION [L3 Turbo]


id0113b5800600

1.  Remove the wastegate control solenoid valve. (SeeINTAKE-AIR SYSTEM REMOVAL/INSTALLATION [L3 Turbo].)

2.  Inspect the airflow between the ports under the following conditions.

acxaaw00000893

•  If not as specified, replace the wastegate control solenoid valve.
•  If as specified, carry out the “Circuit Open/Short Inspection”.
acxaaw00000300


Circuit Open/Short Inspection

1.  Disconnect the PCM connector. (SeePCM REMOVAL/INSTALLATION [L3 Turbo].)

2.  Inspect the following wiring harness for an open or short circuit (continuity check).

acxaaw00000894
acxaaw00000895
acxaaw00000896


Open circuit

•  If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
―  Wastegate control solenoid valve terminal B and PCM terminal 2AA
―  Wastegate control solenoid valve terminal A and main relay terminal E


Short circuit

•  If there is continuity, there is a short circuit. Repair or replace the wiring harness.
―  Wastegate control solenoid valve terminal A and body ground
―  Wastegate control solenoid valve terminal B and power supply
―  Wastegate control solenoid valve terminal B and body ground