PROPELLER SHAFT INSPECTION


id031500800500

1.  Measure the propeller shaft center runout using the dial gauge.

acxuuw00000573

•  If it exceeds the maximum specification, replace the propeller shaft as a single component.
Maximum propeller shaft runout
0.8 mm {0.031 in}

2.  Inspect the play and rotation of the joint by turning the universal joint in the directions shown by the arrows.

ampjjw00002749

•  If it is not within the specification, replace the propeller shaft.
Propeller shaft starting torque
0.29—1.47 N·m {3.0—14.9 kgf·cm, 2.6—13.0 in·lbf}