FRONT STABILIZER CONTROL LINK INSPECTION
id021300800500
1. Remove the front stabilizer control link. (See FRONT STABILIZER REMOVAL.) (See FRONT STABILIZER INSTALLATION.)
2. Inspect the front stabilizer control link for bends or damage.
3. Rotate and shake the front stabilizer control ball joint stud 10 times.
4. Measure the front stabilizer control link ball joint rotational torque using an Allen wrench and a torque wrench.
ac8wzw00001899
|