OIL CONTROL VALVE (OCV) INSPECTION [MZI-3.7]
id0110c5801400
Coil Resistance Inspection
1. Disconnect the negative battery cable.
2. Remove the engine cover. (See ENGINE COVER REMOVAL/INSTALLATION [MZI-3.7].)
3. Disconnect the OCV connector.
4. Measure the coil resistance between terminals A and B using a tester.
ac9wzw00002237
|
5. Install in the reverse order of removal.
Spool Valve Operation Inspection
1. Disconnect the negative battery cable.
2. Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZI-3.7].)
3. Verify that the spool valve in the OCV is in the maximum valve timing retard position as indicated in the figure.
ac9wzw00002238
|
4. Verify that the battery is fully charged.
5. Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing advance position.
ac9wzw00002237
|
ac9wzw00002239
|
6. Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.
7. Install in the reverse order of removal.