POWER LIFTGATE (PLG) FRONT SWITCH INSPECTION
id091100002300
1. Verify that the continuity between the PLG front switch terminals is as indicated in the table.
ac9wzw00001015
|
ac9wzw00001016
|
2. Apply battery voltage to PLG front switch terminal F, and connect terminal E to ground.
3. Verify that the LED illuminates.