POSITIVE CRANKCASE VENTILATION (PCV) VALVE HEATER FITTING INSPECTION [MZI-3.7]
id0116d2105600
With PCV Valve Heater
Resistance Inspection
1. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZI-3.7].)
2. Disconnect the PCV valve heater fitting connector.
3. Measure the resistance between the PCV valve terminals.
ac9uuw00001011
|