GENERAL PROCEDURES (SUSPENSION)


id021000800300


Wheels and Tires Removal/Installation

1.  When installing the wheels and tires, tighten the wheel nuts in a criss-cross pattern to the following tightening torque.

Tightening torque
•  107.8—147.0 N·m {11.0—14.9 kgf·m, 79.6—108.4 ft·lbf}


Suspension Links Removal/Installation

1.  For the joint sections with rubber bushings, raise the vehicle using a lift, and then temporarily tighten the installation bolts and nuts. Lower the vehicle to the ground and tighten them completely with the specified torque.


Steering Links Removal/Installation

1.  If any steering fluid line has been disconnected, perform the following after installation of the power steering components.

―  Power steering fluid amount inspection
―  Power steering fluid leakage inspection
―  Air bleeding
Power steering fluid
ATF M-III, M-V or equivalent (e.g. Dexron®II)


Connector Disconnection

1.  Disconnect the negative battery cable before performing any work that requires handling of connectors.