ELECTRIC VARIABLE VALVE TIMING MOTOR/DRIVER INSPECTION [SKYACTIV-G 2.0]
id0110h2829900
Electric Variable Valve Timing Driver Control Inspection
1. Perform the KOER self-test. If the following DTCs are detected, repair the applicable malfunctioning location according to the applicable DTC troubleshooting. (See DTC INSPECTION.)
2. Access the PCM PIDs [VLV_TIMING_ACT_IN] and [VLV_TIMING_DSD_IN] using the M-MDS data monitor function. (See PID/DATA MONITOR INSPECTION.) (See PID/DATA MONITOR TABLE [PCM (SKYACTIV-G)].)
3. Drive the vehicle (accelerate/decelerate and drive at constant speed), and verify that the PID [VLV_TIMING_ACT_IN] value changes in conjunction with the PID [VLV_TIMING_DSD_IN] value.
Electric Variable Valve Timing Motor Unit Inspection
1. Disconnect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION.)
2. Remove the electric variable valve timing motor/driver. (See ELECTRIC VARIABLE VALVE TIMING MOTOR/DRIVER REMOVAL/INSTALLATION [SKYACTIV-G 2.0].)
3. Rotate the electric variable valve timing motor joint to the left and right by your fingers and verify that it rotates smoothly in 15° increments.
am3uuw00009048
|
4. Install in the reverse order of removal.