CHARCOAL CANISTER INSPECTION [L8, LF]


id0116a3800500


Airflow Inspection

1.  Remove the charcoal canister. (See CHARCOAL CANISTER REMOVAL/INSTALLATION [L8, LF].)

2.  Perform the following procedures:

•  Assemble the hose used for inspection (bore: approx. 5.8 mm {0.23 in}) to port A.
•  Cover ports B and C with the caps.
amxzzw00000830

Caution
•  Do not apply a pressure 20kPa {150 mmHg, 5.91 inHg} or more to the charcoal canister for 1 min. or more. Doing so will damage the charcoal canister.

3.  Apply pressure (19.6 kPa {147 mmHg, 5.79 inHg}) through the hose, and verify that air does not leak from the charcoal canister.

amxzzw00000831

•  If there is airflow, replace the chacoal canister. (See CHARCOAL CANISTER REMOVAL/INSTALLATION [L8, LF].)