PURGE SOLENOID VALVE REMOVAL/INSTALLATION [L8, LF]
id0116a3804300
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [L8, LF].)
2. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [L8, LF].)
Except 6MT
amxzzw00000847
|
6MT
amxzzw00000848
|
1
|
Connector
|
2
|
Vacuum hose (to dynamic chamber)
|
3
|
Evaporative hose (to charcoal canister)
|
4
|
Purge solenoid valve
|
5
|
Bracket
|
3. Install in the reverse order of removal.
Evaporative Hose Installation Note
1. Fit the evaporative hose onto the respective fittings, and install clamps as shown.
amxzzw00000849
|
Vacuum Hose Installation Note
1. Fit the vacuum hose onto the respective fittings, and install clamps as shown.
amxzzw00000849
|