CONTROL VALVE BODY DISASSEMBLY/ASSEMBLY
id051300261800
Components
bsj6za00000896
|
1
|
Shift solenoid C
|
2
|
Shift solenoid B
|
3
|
Shift solenoid D
|
4
|
Shift solenoid A
|
5
|
Shift solenoid E
|
6
|
Shift solenoid F
|
7
|
Pressure control solenoid
|
8
|
Shift solenoid G
|
9
|
TCC control solenoid
|
10
|
Harness clip
|
Disassembly Procedure
1. Remove the shift solenoid C from the control valve body.
bsj6za00000221
|
2. Remove the shift solenoid B shift solenoid D from the control valve body.
bsj6za00000222
|
3. Remove the bolt and the wiring harness clip.
4. Remove the shift solenoid A from the control valve body.
bsj6za00000223
|
5. Remove the shift solenoid E from the control valve body.
bsj6za00000224
|
Assembly Procedure
1. Install the shift solenoid E to the control valve body.
bsj6za00000224
|
2. Install the bolt and the wiring harness clip.
3. Install the shift solenoid A to the control valve body.
bsj6za00000223
|
4. Install the shift solenoid B and the shift solenoid D to the control valve body.
bsj6za00000222
|
5. Install the shift solenoid C to the control valve body.
bsj6za00000221
|