OIL CONTROL VALVE (OCV) INSPECTION
id011000506100
Coil resistance inspection
1. Disconnect the negative battery cable.
2. Disconnect the OCV connector.
3. Measure the resistance between terminals A and B using an ohmmeter.
belbze00000148
|
4. Connect the OCV connector.
Spool valve operation inspection
1. Disconnect the negative battery cable.
2. Remove the OCV.
3. Verify that the spool valve in the OCV is in the maximum valve timing retard position as indicated in the figure.
belbze00000149
|
4. Verify that the battery is fully charged.
5. Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing advance position.
belbze00000150
|
6. Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.