FUEL TANK CONSTRUCTION [L8, LF]
id0114a3101900
• Two rollover valves and a check valve (two-way) are built-in. For the rollover valve and the check valve (two-way), refer to the emission system. (See
ROLLOVER VALVE FUNCTION [L8, LF]
.) (See
ROLLOVER VALVE CONSTRUCTION/OPERATION [L8, LF]
.) (See
CHECK VALVE (TWO-WAY) FUNCTION [L8, LF]
.) (See
CHECK VALVE (TWO-WAY) CONSTRUCTION/OPERATION [L8, LF]
.)