EVAPORATIVE CHAMBER INSPECTION [L8, LF]
id0116a3804700
Aieflow Inspection
1. Remove the evaporative chamber. (See EVAPORATIVE CHAMBER REMOVAL/INSTALLATION [L8, LF].)
2. Blow from port A and verify that there is airflow from port B.
amxzzw00000850
|