ORNAMENT INSTALLATION
id091600994300
4SD
1. Remove any grease or dirt from the ornament installation surface of the trunk lid.
am2zzw00015380
|
2. Warm the ornament installation area to between 15 °C {59 °F} and 40 °C {104 °F} using a heat gun.
3. Install the ornament to the position shown in the figure.
LH
am2zzw00015381
|
RH
am2zzw00009024
|
4. Press the ornament to adhere the double-sided adhesive tape to the ornament installation area.
5HB
1. Remove any grease or dirt from the ornament installation surface of the liftgate.
am2zzw00009025
|
2. Warm the ornament installation area to between 15 °C {59 °F} and 40 °C {104 °F} using a heat gun.
3. Install the ornament to the position shown in the figure.
LH
am2zzw00009026
|
RH
am2zzw00009027
|
4. Press the ornament to adhere the double-sided adhesive tape to the ornament installation area.