1. Pass each wire through the following routes then connect to A/C unit.
2. Connect the climate control unit connectors.
3. Install the center panel.
4. Adjust the climate control unit wires. (See CLIMATE CONTROL UNIT WIRE ADJUSTMENT.)
5. Connect the negative battery cable.