ENGINE TUNE-UP [ZJ, ZY]
id0110b7800600
ENGINE TUNE-UP PREPARATION
1. Verify the following:
2. Warm up the engine to normal operating temperature.
3. Turn off all electrical loads.
4. Connect the M-MDS to the DLC-2.
am2zzw00001633
|
IDLE SPEED INSPECTION
1. Complete the engine tune-up preparation. (See ENGINE TUNE-UP PREPARATION.)
2. Verify that the idle speed (M-MDS: RPM PID) is within the specification.
IGNITION TIMING INSPECTION
1. Complete the engine tune-up preparation. (See ENGINE TUNE-UP PREPARATION.)
2. Verify the ignition timing (M-MDS: SPARKADV) using the PID/data monitor function of the M-MDS.
3. Verify that ignition timing advances when the engine speed increases gradually.
IDLE MIXTURE INSPECTION
1. Verify the following:
2. Warm up the engine to normal operating temperature.
3. Insert an exhaust gas analyzer into the tailpipe.
4. Verify that the CO and HC concentrations are within regulation.
IDLE-UP SPEED CONTROL INSPECTION
1. Complete the engine tune-up preparation. (See ENGINE TUNE-UP PREPARATION.)
2. Verify that the engine speed (M-MDS: RPM PID) is within the specification when each load is applied. (The speed decrease just after the load is applied is not considered.)
Idle-up speed
Load status |
Idle speed (rpm) |
|||
---|---|---|---|---|
ATX: P, N position |
MTX: Neutral |
|||
No load
|
600—700
|
|||
A/C on (With A/C)
|
Refrigerant pressure switch (middle pressure) is off
|
600—700
|
650—750
|
|
Refrigerant pressure switch (middle pressure) is on
|
700—800
|
|||
Electrical loads on
|
Generator generating current value
|
32—40 A
|
600—700
|
650—750
|
above 40 A
|
700—800
|