OIL CONTROL VALVE (OCV) INSPECTION [MZR 1.3, MZR 1.5]


id0110e1801400


Coil resistance inspection

1.  Disconnect the negative battery cable.

2.  Disconnect the OCV connector.

3.  Measure the coil resistance between terminals A and B using a tester.

am2zzw00004924

•  If not within the specification, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)
Oil control valve (OCV) coil resistance
6.9—7.9 ohms [20°C {68°F}]

4.  Connect the OCV connector.


Spool Valve Operation Inspection

1.  Disconnect the negative battery cable.

2.  Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)

3.  Verify that the spool valve inside the OCV is at the maximum valve timing retard position as shown in the figure.

•  If it cannot be verified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)
am2zzw00006234

4.  Verify that the battery is fully charged. (See BATTERY INSPECTION [MZR 1.3, MZR 1.5].)

Note
•  When applying battery positive voltage between the oil control valve terminals, the connection of the negative and positive cable can be either the A or B terminal.

5.  Apply battery positive voltage between oil control valve terminals A and B, and verify that the spool valve operates and moves to the maximum valve timing advance position.

•  If there is any malfunction, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)
am2zzw00004924

6.  Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.

•  If it cannot be verified, replace the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)
am2zzw00006235

7.  Install the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.3, MZR 1.5].)