ENGINE COOLANT TEMPERATURE (ECT) SENSOR INSPECTION [ZY, Z6]
id0140a0802000
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [ZY, Z6].)
2. Disconnect the negative battery cable.
3. Drain the engine coolant. (See ENGINE COOLANT REPLACEMENT [ZY, Z6].)
4. Remove the battery and battery tray. (See BATTERY REMOVAL/INSTALLATION [ZY, Z6].)
5. Disconnect the ECT sensor connector.
6. Remove the ECT sensor. (See ENGINE COOLANT TEMPERATURE (ECT) SENSOR REMOVAL/INSTALLATION [ZY, Z6].)
7. Place the ECT sensor in water with a thermometer, and heat the water gradually.
8. Measure the resistance between the ECT sensor terminals A and B using an ohmmeter.
 am5ezw00001557 
 | 
ECT sensor Specification
| 
 ECT (°C {°F})  | 
 Resistance (kilohms)  | 
|---|---|
| 
 20{68} 
 | 
 Approx. 2.45 
 | 
| 
 80{176} 
 | 
 Approx. 0.318 
 |