FUEL PRESSURE SENSOR INSPECTION [MZR 2.0 DISI i-stop]
id0140j1801300
1. Connect the M-MDS to the DLC-2.
am3uuw00002394
|
2. Switch the ignition to ON (Engine off).
3. Select the FUEL_PRES PID on the M-MDS.
4. After warming up the engine, verify that the FUEL_PRES PID is at the standard value under the following conditions.
Step |
Condition |
FUEL_PRES PID |
---|---|---|
1
|
• Idle
• 90 s after engine is started
|
Approx. 3 MPa
|
2
|
• Idle
• Spill valve solenoid valve connector is disconnected
|
Approx. 530 kPa
|
5. After connecting the spill valve control solenoid valve connector, clear the DTC.