COOLANT RESERVE TANK REMOVAL/INSTALLATION[ZJ, ZY, Z6]
id0112c1801000
1. Drain the engine coolant until the coolant reserve tank becomes empty. (See ENGINE COOLANT REPLACEMENT[ZJ, ZY, Z6].)
2. Remove in the order indicated in the table.
am3zzw00002947
|
1
|
Hose
|
2
|
Coolant reserve tank
|
3. Install in the reverse order of removal.
4. Add engine coolant. (See ENGINE COOLANT REPLACEMENT[ZJ, ZY, Z6].)
5. Inspect for engine coolant leakage. (See ENGINE COOLANT LEAKAGE INSPECTION[ZJ, ZY, Z6].)