REFRIGERANT PRESSURE SWITCH INSPECTION[MZ-CD 1.6 (Y6)]
id0740b3802700
1. Install the SST (gas charging set).
2. Disconnect the refrigerant pressure switch connector.
3. Verify the high‐pressure side reading of the SST (manifold gauge) and continuity between the refrigerant pressure switch terminals.
am3zzw00000815
|
am3zzw00000816
|
am3zzw00000817
|