PRE-TENSIONER SEAT BELT CONSTRUCTION/OPERATION
id081000102000
Construction
am3zzn00000721
|
Operation
Before activation (Normal condition)
am3zzn00000722
|
During activation
1. The generated gas enters the tube, and its pressure pushes the balls.
am3zzn00000723
|
2. Each ball moves in the tube, geared with the pinion, and makes the pinion rotate.
3. The spindle rotates coupled with the rotation of the pinion and winds up the webbing.
After activation
1. The generated gas is exhausted and ball movement stops.
am3zzn00000724
|
2. Several balls that have passed the pinion get into the ball trap.