OIL CONTROL VALVE (OCV) INSPECTION [MZR 1.5, MZR 1.6]
id0110s1801400
Coil resistance inspection
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)
2. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)
3. Disconnect the OCV connector.
4. Measure the coil resistance between terminals A and B using a tester.
am3zzw00006275
|
5. Install in the reverse order of removal.
Spool Valve Operation Inspection
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)
2. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)
3. Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 1.5, MZR 1.6].)
4. Verify that the spool valve inside the OCV is at the minimum valve timing retard position as shown in the figure.
am3zzw00006276
|
5. Verify that the battery is fully charged. (See BATTERY INSPECTION [MZR 1.5, MZR 1.6].)
6. Apply battery positive voltage between oil control valve terminals A and B, and verify that the spool valve operates and moves to the maximum valve timing advance position.
am3zzw00006275
|
am3zzw00006277
|
7. Stop applying battery positive voltage and verify that the spool valve returns to the minimum valve timing retard position.
8. Install in the reverse order of removal.