VARIABLE SWIRL SHUTTER VALVE ACTUATOR INSPECTION [MZR 2.3 DISI Turbo]


id0113d7801200


Operation Inspection

1.  Remove the air hose. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo].)

2.  Disconnect the vacuum hose from the variable swirl control solenoid valve.

3.  Connect a vacuum pump to the variable swirl shutter valve actuator.

4.  Apply vacuum and verify that the rod moves.

Vacuum

(kPa {mmHg, inHg})

Rod movement

–2.7 {–20, –0.8} or less
Not move
–33.4 {–251, –9.9} or more
Fully pulled

•  If the rod does not move, replace the intake manifold. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo].)