INTAKE MANIFOLD VACUUM INSPECTION [MZR 2.3 DISI Turbo]


id0113d7801500

1.  Disconnect the vacuum hose connected between the check valve and the intake manifold from the intake manifold and install the vacuum gauge. (See QUICK RELEASE CONNECTOR (EMISSION SYSTEM) REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo])

2.   Verify that the intake air hoses are installed securely.

3.  Warm up the engine.

4.  Measure the intake manifold vacuum while idling (no load) using the vacuum gauge.

•  If not within the specification, perform the following inspections.
―  Compression pressure (See COMPRESSION INSPECTION [MZR 2.3 DISI Turbo].)
―  Air suction
•  Installation areas of each vacuum hose
•  Installation areas of throttle body
•  Installation areas of fuel injector
•  Installation areas of PCV valve
•  Installation areas of intake manifold
Standard
Approx. –71 kPa {–533 mmHg, –21 inHg}