CLUTCH PEDAL POSITION (CPP) SWITCH INSPECTION [MZR 2.3 DISI Turbo]
id0140e5801600
Continuity Inspection
1. Verify that the CPP switch is installed properly. (See CLUTCH PEDAL REMOVAL/INSTALLATION.)
2. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo].)
3. Disconnect the negative battery cable. (See BATTERY REMOVAL/INSTALLATION [MZR 2.3 DISI Turbo].)
4. Disconnect the CPP switch connector. (See CLUTCH PEDAL REMOVAL/INSTALLATION.)
5. Verify that the continuity between CPP switch terminals A and B when the clutch pedal is depressed and when it is released is according to the following table:
am3zzw00011784
|