VARIABLE AIR DUCT (VAD) SHUTTER VALVE INSPECTION [MZR 2.5]
id0113d08038d3
Operation Inspection
1. Remove the air cleaner case. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)
2. Disconnect the vacuum hose from the VAD shutter valve actuator.
3. Connect a vacuum pump to the VAD shutter valve actuator.
am6zzw00005173
|
4. Apply vacuum and verify that the rod moves.
am6zzw00005174
|
Vacuum kPa {mmHg, inHg} |
Rod movement |
---|---|
Below –10 {–75, –3.0}
|
Starts to move
|
Above –35 {–263, –10.4}
|
Fully pulled
|