CHARCOAL CANISTER REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5]


id0116d3801500

1.  Remove the battery. (R.H.D.) (See BATTERY REMOVAL/INSTALLATION [MZR 1.8, MZR 2.0, MZR 2.5].)

2.  Pull up the charcoal canister from the notch of the charcoal canister installation bracket.

3.  Remove in the order indicated in the table.

am6zzw00005228

1
Evaporative hose
2
Charcoal canister

4.  Install in the reverse order of removal.


Evaporative Hose Installation Note

1.  Install the evaporative hose and clip as shown in the figure.

am6zzw00005229