OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [MZR 2.0 DISI]


id011007801300

1.  Disconnect the negative battery cable.

2.  Remove the plug hole plate. (See PLUG HOLE PLATE REMOVAL/INSTALLATION [MZR 2.0 DISI].)

3.  Disconnect the wiring harness.

4.  Remove the ignition coils. (See IGNITION COIL REMOVAL/INSTALLATION [MZR 2.0 DISI].)

5.  Disconnect the ventilation hose from the cylinder head cover.

6.  Remove the dipstick.

7.  Remove the cylinder head cover. (See TIMING CHAIN REMOVAL/INSTALLATION [MZR 2.0 DISI].)

8.  Remove in the order indicated in the table.

9.  Install in the reverse order of removal.

am3uuw00002365

1
OCV installation bolt
2
OCV