1. Remove the air hose. (See INTAKE AIR SYSTEM REMOVAL/INSTALLATION [L3 Turbo].)
2. Disconnect the hose from the wastegate actuator.
3. Plug the wastegate actuator as shown in the figure.
4. Connect the SST to the port.
5. Raise the pressure slowly and take a measurement of the pressure when the rod stroke is 1.5 mm {0.06 in}.