FUEL WARMER CONSTRUCTION (COLD DISTRICT SPECIFICATIONS) [MZR-CD (RF Turbo)]


id0114f11483d0

• Installed to the side of the priming pump. Consists of the vacuum switch and the fuel warmer heater.