CHARCOAL CANISTER CONSTRUCTION/OPERATION [L3 Turbo]
id0116b4102000
• Installed on the rear of the fuel tank.
• During purge solenoid valve operation, atmosphere enters the charcoal canister from the atmospheric orifice to entirely flood the activated charcoal and release the evaporative gas.
|
1
|
To air filter
|
|
2
|
To purge solenoid valve
|
|
3
|
To fuel tank
|